Description
Ratio between the total cost of a group of cases and the lead time of a group of cases.
Potential use
Event log in which the total cost in relation to the total time taken for conducting the cases of a group of cases is of relevance.
Assumptions
Ratio between total cost and lead time should be as close to 0 as possible.
Desired Value:
Required attributes
actinstcasetctimetype
Equations
Formula for practitioners
returns the total cost of case group .
returns the total lead time of case group .
Formal Definition
The indicates that the PPI can take multiple forms, in this case, . If , then the function considers single events of activity instances for cost calculations, i.e., it uses ; if , then the function considers the sum of all events of activity instances for cost calculations, i.e., it uses .
Tags
Python implementation
This indicator is implemented in the process_performance_indicators Python library.
process_performance_indicators.indicators.cost.groups.total_cost_and_lead_time_ratio