Description
Ratio between the total cost associated with all instantiations of an activity in the event log, and the sum of lead time for all instantiations of an activity in the event log.
Potential use
Event log in which the total cost in relation to the total time taken for conducting activity instances is of relevance.
Assumptions
Ratio between total cost and lead time should be as close to 0 as possible.
Desired Value:
Required attributes
actactinstcasetctimetype
Equations
Formula for practitioners
returns the total cost of activity .
returns the total lead time of activity .
Formal Definition
The indicates that the PPI can take multiple forms, in this case, . If , then the function considers single events of activity instances for cost calculations, i.e., it uses ; if , then the function considers the sum of all events of activity instances for cost calculations, i.e., it uses .
Tags
Python implementation
This indicator is implemented in the process_performance_indicators Python library.
process_performance_indicators.indicators.cost.activities.total_cost_and_lead_time_ratio