Expected Total Cost

View in library docs
eTC×(g)\mathit{e}\mathit{TC}\mathit{^{\times}}(g)
×{sgl,sum}\mathit{\times} \in \{\mathit{sgl}, \mathit{sum}\}
Dimension:
Cost
Granularity:
Group of cases

Description

Expected total cost associated with all activity instances of a case belonging to a group of cases.

Potential use

Event log in which total cost information is recorded.

Assumptions

Minimizing total cost is desirable.

Desired Value:

MINIMIZE

Required attributes

actinst
case
tc
type

Equations

Formula for practitioners

TC(g)C(g)\frac{\mathit{TC}(g)}{\mathit{C}(g)}

TC(g)\mathit{TC}(g) returns the total cost for group gg.
C(g)\mathit{C}(g) returns the number of cases in group gg.

Formal Definition

TC×(g)C(g)\frac{\mathit{TC}\mathit{^{\times}}(g)}{\mathit{C}(g)}
The ×\mathit{\times} indicates that the PPI can take multiple forms, in this case, ×{sgl,sum}\mathit{\times} \in \{\mathit{sgl}, \mathit{sum}\}. If ×=sgl\mathit{\times} = \mathit{sgl}, then the function considers single events of activity instances for cost calculations, i.e., it uses TCsgl\mathit{TC}\mathit{^{sgl}}; if ×=sum\mathit{\times} = \mathit{sum}, then the function considers the sum of all events of activity instances for cost calculations, i.e., it uses TCsum\mathit{TC}\mathit{^{sum}}.

Tags

actinst
case
tc
type

Python implementation

This indicator is implemented in the process_performance_indicators Python library.

process_performance_indicators.indicators.cost.groups.expected_total_cost