Expected Overhead Cost

View in library docs
eOC×(g)\mathit{e}\mathit{OC}\mathit{^{\times}}(g)
×{sgl,sum}\mathit{\times} \in \{\mathit{sgl}, \mathit{sum}\}
Dimension:
Cost
Granularity:
Group of cases

Description

Expected total cost associated with all instantiations of activities that do not have a direct effect on the outcome of a case belonging to a group of cases.

Potential use

Event log in which activities can be categorized based on whether they directly contribute to the outcome of the process or not.

Assumptions

Minimizing total cost is desirable.

Desired Value:

MINIMIZE

Required attributes

act
actinst
case
tc
type

Equations

Formula for practitioners

OC(g)C(g)\frac{\mathit{OC}(g)}{\mathit{C}(g)}

OC(g)\mathit{OC}(g) returns the total overhead cost for group gg.
C(g)\mathit{C}(g) returns the number of cases in group gg.

Formal Definition

OC×(g)C(g)\frac{\mathit{OC}\mathit{^{\times}}(g)}{\mathit{C}(g)}
The ×\mathit{\times} indicates that the PPI can take multiple forms, in this case, ×{sgl,sum}\mathit{\times} \in \{\mathit{sgl}, \mathit{sum}\}. If ×=sgl\mathit{\times} = \mathit{sgl}, then the function considers single events of activity instances for cost calculations, i.e., it uses OCsgl\mathit{OC}\mathit{^{sgl}}; if ×=sum\mathit{\times} = \mathit{sum}, then the function considers the sum of all events of activity instances for cost calculations, i.e., it uses OCsum\mathit{OC}\mathit{^{sum}}.

Tags

act
actinst
case
tc
type

Python implementation

This indicator is implemented in the process_performance_indicators Python library.

process_performance_indicators.indicators.cost.groups.expected_overhead_cost